We have had the privilege to work on some amazing projects. Below are just a few of our key projects from the last few years.

Pump Track -
Roxby Downs, South Australia

Aerial view of a skate park under construction near a grassy sports field and adjacent to a large building, with surrounding roads and trees.

The Roxby Downs Council with the community wanted to develop and improve community spaces within the Roxby Downs Township, through consultation with the community it was decided to design and construct a pump track at the corner of Burgoyne Street and Olympic Way, Red Mulga Australia were successfully awarded the tender and worked with the Roxby Downs Council to construct 3 Parkitect Concrete Modular pump tracks within the location provided.

Works consisted of grubbing and clearing the existing location, constructing a hardstand within the area with a 3 slight increases to off set the pump tracks, pouring a foundation for the pump tracks and installation of the pump tracks on the foundation for longevity of the tracks, once the tracks were installed Red Mulga Australia installed concrete footpaths to link the tracks, seating, shelter and a BBQ to provide rest areas for occupants, and a fence to enclosed the area.

Outdoor area with trees and pathways under a clear blue sky, labeled as "Pump Track."

Grubbing and clearing the existing location.

Construction site with architectural structures and cloudy sky

Installation of the pump tracks on the blinding foundation.

Construction site with heavy machinery leveling a large dirt area, surrounded by fencing and trees in the background.

Constructing a hardstand within the area with a 3 slight increases to offset
the pump tracks.

Aerial view of a construction site with freshly built concrete structures, possibly for a skate park or track layout, surrounded by dirt and construction equipment.

Installation of concrete footpaths in the beehive colour to link the tracks.

Construction site with workers and machinery on a clear day

Pouring of a blinding foundation for the pump tracks to be situated on.

Aerial view of a dirt construction site with outlined paths and roads, surrounded by trees and a few buildings. Top left shows an intersecting road.

Installation of recreational infrastructure including seating, shelters, and a BBQ.

Aerial view of a water treatment facility with large circular tanks and adjacent buildings, surrounded by desert landscape.

Town Tanks -
Roxby Downs, South Australia

Red Mulga Australia successfully executed the Civil, Structural, Mechanical, Piping, Electrical and Instrumentation packages associated with the construction of three new 5ML potable water storage tanks in the Roxby Downs Township.

Works consisted of grubbing and clearing the area, constructing a hardstand for the new tanks, installation of three concrete ring beams for the tanks to be installed onto, installation and connection of piping from the existing inlet to the existing outlet with no impact to the Towns water supply, installation of electrical services and instrumentation to ensure the tanks operate efficiently.

Construction site at night with large concrete pump truck and mixer pouring concrete onto a round foundation, illuminated by bright lights.

Grubbing and clearing the area + constructing a hardstand for the new tanks.

Aerial view of industrial site with three large circular storage tanks, rectangular black-lined pit, surrounding dirt roads, vegetation, and nearby buildings.

Installation of electrical services and instrumentation to ensure the tanks operate efficiently. 

A yellow road grader working on a dirt road in a rural area with clear blue sky.

Installation of three concrete ring beams for the tanks to be installed onto.

Trench with utility pipes and large industrial storage tank

Installation and connection of piping from the existing inlet to the existing outlet to the new tanks with no impact to the Towns water supply.

Oversize Access Road
Olympic Dam, South Australia

Dirt road in a rural area with clear sky

Red Mulga Australia were engaged to construct an access road for oversized vehicles to enter the Olympic Dam mine site.

Works consisted of constructing a 400m long, 12m wide access road off Olympic Way, supply, and installation of box culverts under the road to prevent water damaged the access road, supply and installation of access gates and fencing to prevent unauthorised access to the road once constructed.

Dirt road under a blue sky with clouds, surrounded by grass and shrubs, showing tire tracks.

Construction of a 400m long, 12m wide access road off Olympic Way.

Construction site with concrete structure and workers

Supply and installation of signage and delineators.

Road roller in desert landscape with blue sky

Constructing a hardstand within the area with a 3 slight increases to offset
the pump tracks.Supply, and installation of box culverts under the road to prevent water damaged the access road.

Construction site with heavy machinery, including a grader and an excavator, on a dirt road in a rural area under a clear blue sky.

Supply and installation of access gates to prevent unauthorised access to the road once constructed.